TRANSPORTATION SCADA

OUR REFERENCES

Our Scada Projects on Railway Systems

  1. İstanbul / Aksaray – Atatürk Airport  Metro Line (M1A)

     Aksaray – Bağcılar Metro Line(M1B)

  • 23 stations
  • Tunnels that are 26 kilometers in length
  • 44 redundant PLC Controllers
  •  I/O above 22.000
  • ECS and CER SCADA Control System
  • 75 SCADA Screens
  • Redundant Central Control
  • WinCC Open Architecture SCADA

 

  1. İstanbul / Kadıköy – Kartal – Kaynarca Metro Line(M4)
    • The longest metro line in Turkey
    • 19 Stations , a Depot Area
    • Tunnel that is 55 kilometers in length
    • 40 hot redundant PLC controllers
    •  I/O above 100.000
    • ECS and CER SCADA Control System
    • SCADA Screens
      • 350 Environmental  Control Screens
      • 110 Energy Monitoring  System Screens
    • Redundant Central Control
    • WinCC Open Architecture SCADA

 

  1. İstanbul / Üsküdar – Ümraniye Metro Line(M5)
    • 16 stations, a  Depot Area
    • Tunnel that is 20 km in length
    • 51 hot redundant PLC controllers
    • 119 MCC-PLC Pannels
    •  I/O above 100.000
    • ECS and CER SCADA Control System
    • SCADA Screens
      • 300 Environmental  Control Screens
      • 100 Energy Monitoring System Screens
    • Disaster Recovery Redundant Central Control
    •  Special  IEC Communication  Drivers written with SCL
    • WinCC Open Architecture SCADA

 

 

 

  1. İstanbul / Levent – Rumeli Hisarüstü Metro Line (M6)
    • 5 Stations
    • Tunnel that is 4 kilometres in length
    • 10 Hot Redundant PLC Controllers
    •  I/O  above 10.000
    • ECS and CER SCADA Control System
    • Disaster Recovery Redundant Central Control
    • WinCC Open Architecture SCADA

 

  1. İstanbul / Kabataş – Bağcılar Tramline(T1)
    • 31 passenger stations
    •  Line that is 18.5 kilometers long
    • 12  Transformer Stations
    • I/O above 5.000
    • CER SCADA Control System
    • WinCC Open Architecture SCADA

 

  1. İstanbul / Topkapı – Habipler Tramline (T4)
    • 22 passenger stations
    • Line that is 13,5 kilometers long
    • 10  Transformer Stations
    • I/O above 7.000
    • ECS ve CER SCADA Control System
    • WinCC Open Architecture SCADA

 

  1. Eskişehir / Tramline
    • 61 passenger stations
    • Line  that is 45 kilometers long
    • 16 Transformer Stations
    • ECS and CER SCADA Control System
    • WinCC Open Architecture SCADA

 

  1. Gaziantep / Tramline
    • 13 passenger stations
    • Line that is 9 kilometers long 
    • 12  Transformer Stations
    • CER SCADA Control System
    • WinCC Open Architecture SCADA

 

  1. İzmir / Metro Line
    • 17 stations
    • Line that is 20 kilometers long
    • 21  PLC Controllers
    • I/O above 50.000
    • Redundant Central Control
    • WinCC Open Architecture SCADA

 

  1. İzmir / Karşıyaka Tramline
    • 8 Transformer Stations
    • I/O above 7.000
    • CER SCADA Control System
    • WinCC Open Architecture SCADA

 

  1. İzmir / Konak Tramline
    • 6 Transformer Stations
    •  I/O above 5.000
    • CER SCADA Control System
    • WinCC Open Architecture SCADA

 

  1. Kocaeli / Tramline
    • 7 Transformer Stations
    •  I/O above 5.000
    • CER SCADA Control System
    • WinCC Open Architecture SCADA

Our Scada Projects on Highway Systems

  1. Düzce / Alaplı  Highway Tunnels
    • 9 Serial Tunnels
    • 5 Energy Distribution Buildings
    • ECS and CER SCADA Control System
    • Traffic Control Systems in Tunnels
    • Redundant Central Control
    • WinCC Open Architecture SCADA

 

  1. Artvin / DSİ Highway Tunnels
    • 5 Serial Tunnels
    • 4 Energy Distribution Buildings
    • ECS and CER SCADA Control System
    • Traffic Control Systems in Tunnels
    • Redundant Central Control
    • WinCC Open Architecture SCADA

 

  1. Fethiye / Highway Tunnel
    • 1 Tunnel
    • 1 Energy Distribution Building
    • ECS and CER SCADA Control System
    • Traffic Control Systems in Tunnels
    • Redundant Central Control
    • WinCC Open Architecture SCADA