Çanakkale / 1915 Çanakkale Bridge

PROJECT DETAILS

Within the scope of the project, SCADA design and commissioning of all subsystems of the 1915 Çanakkale Bridge are carried out.

Requirements;

  • Monitor, Control and Operate the 4,5km Bridge System
  • Integrations with different systems (Energy, Video, Announce, Traffic Systems, Lighting, Fire Alarm, Dehum, SHMS, Toll Collection, ICCP, ITS, GIS etc.)

Solution;

  • 4 Hot Redundant PLC Controller for Control and Monitoring System
  • 4 Set of PLC Controller for Power Management System
  • More than 60 Local PLC Controller
  • WinCC Open Architecture SCADA

System Integrations

  • Power Management System (PMS)
  • Control and Monitoring System (CMS)
  • LV Distribution System
  • Roadway Lighting System
  • Architectural Lighting
  • Aviation Warning Lights
  • Marine Navigation Lights
  • Bridge Dehumidification Systems
  • Access Control System
  • Intruder Alarm System
  • Technical Areas Lighting
  • Fire Detection
  • Lifts in Towers
  • Traffic Management System (TMS)
  • Power Management System (PMS)
  • Control and Monitoring System (CMS)
  • LV Distribution System
  • Roadway Lighting System
  • Architectural Lighting
  • Aviation Warning Lights
  • Marine Navigation Lights
  • Bridge Dehumidification Systems
  • Access Control System
  • Intruder Alarm System
  • Technical Areas Lighting
  • Fire Detection
  • Lifts in Towers

 

PROJECT SUMMARY
Contract / Project Name 1915 Çanakkale Bridge SCADA System
Project Start Date
Project Finish Date
Project Role Sub-Contractor
Project Category Bridge SCADA System
Location Çanakkale / TURKEY