Eskişehir / Tram Line

PROJECT DETAILS

Within the scope of this project, SCADA system has been designed for all sub-systems and power equipments in 16 transformer stations.

  • 61 Passenger Stations
  • 16 Transformer Stations
  • Total Length: 45 km
  • PLC Controller (GE – RTU D25)
  • More than 10.000 I/O
  • CER SCADA Control System
  • Redundant SCADA Server
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name Eskişehir Tram Line SCADA System
Project Start Date July 2014
Project Finish Date September 2015
Project Role Sub-Contractor
Project Category Tram Line SCADA System
Location Eskişehir / TÜRKİYE