İstanbul / Aksaray-Bağcılar and Aksaray-Atatürk Airport Metro Lines (M1A & M1B)

PROJECT DETAILS

Within the scope of this project, SCADA system has been designed for all sub-systems of metro line with 23 underground stations including power, environmental and station equipments.

  • 23 Stations
  • Total Tunnel Length: 26 km
  • 44 Hot Redundant PLC Controllers (Siemens – S7 400)
  • More than 22.000 I/O
  • ECS, CER ve SCADA Control System
  • 75 SCADA Screens
  • Redundant SCADA Server
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name Aksaray-Atatürk Airport Metro Line SCADA System

Aksaray-Bağcılar Metro Line SCADA System

Project Start Date September 2012
Project Finish Date March 2015
Project Role Sub-Contractor
Project Category Metro Line SCADA System
Location İstanbul / TÜRKİYE