PROJECT DETAILS

Within the scope of this project, SCADA system has been designed and commissioned for all sub-systems of metro line with 4 underground stations including power, environmental and station equipments.

  • 4 Underground Stations
  • 8 Hot Redundant PLC Controllers ( ABB – AC 500)
  • More than 25.000 I/O
  • ECS and PCS SCADA Control System
  • Redundant SCADA Server Architecture
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name Başakşehir – Kayaşehir Metro Line SCADA System
Project Finish Date
Project Role Sub-Contractor
Project Category Metro Line SCADA System
Location Istanbul / TURKEY