PROJECT DETAILS
Within the scope of this project, SCADA system has been designed and commissioned for all sub-systems of metro line with 4 underground stations including power, environmental and station equipments.
- 4 Underground Stations
- 8 Hot Redundant PLC Controllers ( ABB – AC 500)
- More than 25.000 I/O
- ECS and PCS SCADA Control System
- Redundant SCADA Server Architecture
- WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name | Başakşehir – Kayaşehir Metro Line SCADA System |
Project Finish Date | |
Project Role | Sub-Contractor |
Project Category | Metro Line SCADA System |
Location | Istanbul / TURKEY |