İstanbul / Dudullu-Bostancı Metro Line (M8)

PROJECT DETAILS

Within the scope of this project, SCADA system has been designed for all sub-systems of metro line with 13 underground stations including power, environmental and station equipments.

  • 13 Underground Stations, 1 Storage
  • Total Tunnel Length: 14 km
  • 42 Hot Redundant PLC Controllers ( ABB – AC 500)
  • More than 100.000 I/O
  • ECS, PCS, EMS ve SCADA Control System
  • SCADA Details;
    • Aprx. 250 Environmental Control Screen
    • Aprx. 100 Energy Monitoring Screen
  • Disaster Recovery Redundant Control Center
  • Redundant SCADA Server
PROJECT SUMMARY
Contract / Project Name Dudullu-Bostancı Metro Line SCADA System
Project Start Date January 2017
Project Finish Date
Project Role Sub-Contractor
Project Category Metro Line SCADA System
Location İstanbul / TÜRKİYE