İstanbul / Kabataş – Bağcılar Tram Line (T1)

PROJECT DETAILS

Within the scope of this project, SCADA system has been designed for all sub-systems and power equipments in 12 transformer stations.

  • 31 Passenger Stations
  • 12 Transformer Stations
  • Total Length: 18,5 km
  • PLC Controllers (Siemens – S7 400)
  • More than 7.500 I/O
  • PCS SCADA Control System
  • Redundant SCADA Server
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name Kabataş – Bağcılar Tram Line SCADA System
Project Start Date 2010
Project Finish Date February 2011
Project Role Sub-Contractor
Project Category Tram Line SCADA System
Location İstanbul / TÜRKİYE