İstanbul / Kabataş – Mecidiyeköy – Mahmutbey Metro Line (M7)

PROJECT DETAILS

Within the scope of this project, SCADA system has been designed for all sub-systems of metro line with 19 underground stations including power, environmental and station equipments.

  • 19 Underground Stations, 1 Storage
  • Total Tunnel Length: 24,5 km
  • 60 Hot Redundant PLC Controllers ( ABB – AC 500)
  • More than 150.000 I/O
  • ECS, PCS, EMS ve SCADA Control System
  • SCADA Details;
    • Aprx. 250 Environmental Control Screen
    • Aprx. 150 Energy Monitoring Screen
  • Redundant SCADA Server
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name Kabataş – Mecidiyeköy – Mahmutbey Metro Line SCADA System
Project Start Date June 2017
Project Finish Date
Project Role Sub-Contractor
Project Category Metro Line SCADA System
Location İstanbul / TÜRKİYE