İstanbul / Kirazlı – Bakırköy Metro Line (M3)

PROJECT DETAILS

Within the scope of this project, SCADA system has been designed and commissioned for all sub-systems of metro line with 18 underground stations including power, environmental and station equipments.

  • 18 Underground Stations
  • 36 Hot Redundant PLC Controllers ( ABB – AC 500)
  • More than 75.000 I/O
  • ECS and PCS SCADA Control System
  • Redundant SCADA Server Architecture
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name Kirazlı – Bakırköy Metro Line SCADA System
Project Finish Date
Project Role Sub-Contractor
Project Category Metro Line SCADA System
Location Istanbul / TURKEY