PROJECT DETAILS
Within the scope of this project, SCADA system has been designed for all sub-systems of metro line with 16 underground stations including power, environmental and station equipments.
- 16 Underground Stations, 1 Storage
- Total Tunnel Length: 20 km
- 51 Hot Redundant PLC Controllers (Siemens – S7 400)
- Total 119 MCC-PLC Panels
- More than 100.000 I/O
- ECS, PCS, EMS ve SCADA Control System
- SCADA Details;
- Aprx. 300 Environmental Control Screen
- Aprx. 100 Energy Monitoring Screen
- Disaster Recovery Redundant Control Center
- WinCC Open Architecture SCADA
- Custom Developed IEC Communication Protocol (SCL)
PROJECT SUMMARY
Contract / Project Name | Üsküdar-Ümraniye-Çekmeköy Metro Line SCADA System |
Project Start Date | September 2015 |
Project Finish Date | November 2017 |
Project Role | Sub-Contractor |
Project Category | Metro Line SCADA System |
Location | İstanbul / TÜRKİYE |