PROJECT DETAILS

Within the scope of this project, SCADA system has been designed for all sub-systems and power equipments in 6 transformer stations.

  • 6 Passenger Stations
  • PLC Controllers (ABB – AC 500)
  • More than 5.000 I/O
  • CER SCADA Control System
  • Redundant SCADA Server
  • WinCC Open Architecture SCADA
PROJECT SUMMARY
Contract / Project Name İzmir Tram Line SCADA System
Project Start Date Novermber 2015
Project Finish Date 2018
Project Role Sub-Contractor
Project Category Tram Line SCADA System
Location İzmir / TÜRKİYE